Regulation of Tianjin Municipal Transportation Commission on Publishing Standard Time Limits for Container Goods Operation in Tianjin Port

法律法规网 作者:小柯
来源 来源: 政府  法律法规网 时间: 2020-05-06 17:22:27  评论(/)

Project

Service Links

Service Contents

Commitment delivery rate/time limit

Dock

Operation time

Operation time of the port

24-hour service, 365 days

Ship dynamics

Assure dynamic and punctual entry and exit of ships

The rate of dynamic plan change on account of the port authority is no higher than 1.5%, and the rate of container liner missing on account of the port authority is no higher than 1.5%

Direct parking of ships

Assure direct entry of punctual container lines after arrival

Direct parking rate of punctual container lines above 92%

Ship parking

The mooring rope operator is quickly ready to assure timely parking of ships and shorten the parking time

The average parking time of ships is no longer than 30 minutes, excluding factors not attributable to the port authority

Operation efficiency

Average operation efficiency of container crane of the port

The average operation efficiency of single container crane is higher than 28.5 natural containers/hour

Container truck handover

Shorten the handover time of container truck trailers in the dock yard and ensure the transport efficiency inside the yard

The average handover time of container trucks is no longer than 30 minutes

Processing at Business Hall

Each window of the business hall processes various business procedures for customers.

Within 10 minutes

Gate Releasing

Verify the information related to vehicles and containers, and release upon the confirmation without errors

Within 2 minutes

Delivery reservation

You can submit the import container reservation plan at the acceptance center while making an online reservation of delivery operation, given the regulator’s release and complete procedure

99%

Delivery and concentration operation

Perform container delivery and dropping operation based on delivery and concentration instruction

Proportion is increased to 70% within 30 minutes;

Proportion is increased to 92% within 60 minutes.

Yard

Unpacking and Pick Up

pick up procedures are processed for consignee, and reasonable machinery and manpower arrangements are made for unpacking loading operations

Manpower: 3 hours

Machinery: 2 hours

Empty Container Collection

Print out the information on container inspection and data entry at the gate as discharge container receipts, and provide discharge container services as per the discharge container receipts.

Within 40 minutes

Check

Check reservation

After receiving the check instruction from the customs, the customer can perform the check reservation procedure for import container (general goods) at the acceptance center

99%

Check of general goods

Time limit for unloading and loading operations

3 hours/TEU

Comprehensive

Tugboat operation

Punctuality rate of tugboat parking operation

Punctuality rate above 95% (excluding reasons attributable to tugboat)

Pilot boarding

Punctuality rate of pilot boarding

Punctuality rate 100% (excluding reasons attributable to pilot)

Handling product information

Time limit for transmission of handling product information

Within 2 hours after completion

tags:

站长推荐 / Recommend

最近更新 / Latest

站长推荐:

网站首页 关于我们 友情链接 广告服务 联系我们 网站地图 免责声明 WAP
Powered by LC123.NET 8.5  © 2009-2015 红火传媒
鲁ICP备11015312号-1 本站常年法律顾问 王正兴 律师
统计: